SHANGHAI · GLOBAL ROBOT SUPPLY & ENGINEERINGliubin.hu@lajiuautomation.com
Home / Relocation & recommissioning

ENGINEERING / SERVICES

Relocation & recommissioning

Robot and production-line relocation requires continuity between pre-disassembly records, reinstallation interfaces and recommissioning. Lajiu provides related engineering services, starting with the operating baseline, equipment inventory and destination conditions to define dismantling, transport coordination, controls recovery and acceptance responsibilities.

Record the baseline before dismantling

Separate existing issues from the functions to be restored after the move. Preserve equipment identification, connections and operating records. Documents can be reviewed remotely in advance; labels and site records must match the physical equipment.

  • Inventory of robots, controllers, tools and peripherals, including models, serial numbers and existing issues.
  • Program and parameter backups, relevant drawings, network configuration and connection labels.
  • Baseline operating records and fixture and equipment installation-reference information.

Check the destination before the move

Define the destination layout, installation foundations, electrical supply, compressed air, network and line interfaces. Changes to robot and fixture positions may require additional teaching and process validation, which should be considered in the relocation scope.

Assign responsibilities across teams and locations

The quotation should assign dismantling, packing, lifting, freight, insurance, reinstallation and commissioning separately. Cross-border work also requires agreement on documentation, shipping terms, site access and local support. Requirements and timing depend on the origin, destination and project scope.

Recommissioning checks and handover

After reinstallation, use the applicable equipment documentation and project plan to check mechanical and electrical connections, mastering and fixture references before coordinated operation and process trials. Acceptance should identify which checks compare with the original baseline and which address the new site or process changes.

  • Agree trial parts, operating conditions, trial duration and quality inspection methods in advance.
  • Handover can include inventories, backups, reinstallation checks, change records and outstanding actions.

Common questions

Are controller details needed when moving only a robot?

Identify whether the manipulator, controller and cables are moving together, and provide complete model and configuration details. The controller, software options, installation position and tools affect reinstallation and recovery scope.

Can you support reinstallation and commissioning overseas?

Submit the destination country and city, site conditions, equipment details and schedule for assessment. Personnel, local support, tools, scope and implementation conditions are agreed for the project.

Does a relocation quotation automatically include freight and customs clearance?

Each responsibility must be stated in the quotation. Engineering, packing and lifting, freight, insurance and documentation should be agreed separately to avoid gaps or overlapping supplier scopes.

Lajiu provides independent robot service and engineering. Brand names identify equipment and do not indicate manufacturer authorisation. Service scope, parts and acceptance terms are confirmed per quotation.