
- Application
- Laser welding and assembly
- Components
- UVW busbars, sensors and power modules
- Documented processes
- Loading, manual tightening, automatic leak testing and automatic welding
Processes in the project reference
This reference illustrates a station combining component loading, manual assembly, automatic testing and welding.
- Component loading: UVW busbars, sensors and power modules.
- Assembly operation: manual tightening.
- Automatic operations: leak testing and welding.
For a similar station: defining the enquiry
For a new project, define the input conditions, supply boundaries and acceptance methods for welding, assembly and testing, then agree how the complete station must operate together.
- Provide component drawings, materials, weld locations, assembly sequence and product variants.
- Define loading arrangements, tightening requirements, leak-test conditions and weld-quality assessment.
- Separate target cycle time from measured cycle time, and agree samples, test conditions, repetitions and handover records.
Based on Lajiu’s existing project materials, this reference describes the recorded processes and scope of work; project parameters and acceptance results are governed by the corresponding records.
